Engineering: How Tunnel Boring Works and What Loop Tunnels Change
A reference for students and engineers on how bored tunnels are built, where small-diameter Loop tunnels fit, and which Boring Company claims are goals rather than demonstrated results. Status facts are as of November 26, 2026.
- 12 ftInside diameter of the first Las Vegas Convention Center Loop tunnels, as reported in 2021Source [1]
- 13.5 ftOutside diameter of the same tunnels, as reported in 2021Source [1]
- 1 mile per weekPrufrock speed that The Boring Company says it is targeting (a goal, not an audited average)Source [2]
- 1,250 ftDefault maximum distance between exits in the proposed Clark County single lane tunnel chapterSource [3]
- 123 kWhDefault cap on vehicle battery energy in the same proposed chapter unless officials approve moreSource [3]
TBM basics: three machine families
A tunnel boring machine (TBM) excavates the ground, supports the face, and builds the permanent lining in one moving assembly. The main design choice is how the machine holds up the face. In soft or water-bearing ground a closed-face shield pushes against the soil with controlled pressure. In sound rock the face can stand open and the machine grips the walls instead. The FHWA road tunnel manual treats the choice of closed-face machine as a decision driven by ground type, contractor experience, and logistics [4].
In an earth pressure balance (EPB) machine the cutterhead loosens and conditions the soil, and the conditioned soil in the excavation chamber carries the support pressure to the face [5]. A screw conveyor removes material from the bottom of the chamber, and its speed relative to the advance rate sets the chamber pressure [5]. ITA-AITES describes EPB shields as suited to ground with limited or no self-supporting capacity, mainly silts and clays with sand, with foams or other additives extending the range [6].
A slurry shield supports the face with pressurized bentonite slurry instead. Spoil leaves the chamber mixed with the slurry and is pumped to a separation plant on the surface [7]. That suits sand and gravel with silt and pressurized groundwater, at the cost of the plant footprint [7]. The FHWA manual notes that EPB and slurry machines are approaching interchangeability as chemical conditioners improve, with the edge going to slurry in coarse ground or where a crusher may be needed for boulders [4].
Hard rock machines are the third family. Open gripper and main beam types brace against the rock instead of pressurizing the face. The Boring Company describes its Prufrock-MB variant as built for places where the rock itself is strong enough to act as the liner [2].
Face pressure has a simple lower bound. The chamber must at least balance the pore water pressure at the tunnel axis, plus an allowance for earth pressure. Water exerts about 0.433 psi per foot of head, so 40 ft of groundwater above the axis needs roughly 17 psi (62.4 pcf times 40 ft, divided by 144, derived). Too little pressure risks a face collapse and surface settlement, while too much risks blowouts to the surface.
- Cutterhead: rotating tool carrier that breaks up and conditions the face [5].
- Thrust cylinders: hydraulic jacks push the shield forward from the last built segment ring [5].
- Segment erector: a remote-controlled vacuum manipulator places each segment during ring building [5].
- Tail seal: rows of steel brushes filled with sealing compound isolate the tunnel from the annulus and groundwater [5].
- Annulus grouting: grout is injected through ports fixed in the shield tail while the shield advances, and the manual says this works only with a bolted, gasketed segmental lining [4].
Diameter and why it matters
Excavated cross-section area is pi times r squared, so it grows with the square of diameter. A 12 ft bore has a radius of 6 ft and an area of 3.1416 x 36 = 113 square feet. A 21 ft bore has r = 10.5 ft and 3.1416 x 110.25 = 346 square feet. A 30 ft bore has r = 15 ft and 3.1416 x 225 = 707 square feet. The 21 ft bore therefore removes about 3.1 times as much soil per foot of advance as the 12 ft bore, and the 30 ft bore about 6.3 times (derived).
Muck, grout, segment mass, and cutterhead torque all scale up with that area, which is the basic cost argument for small bores. ENR reported in 2021 that the first Las Vegas Convention Center Loop tunnels had a 12 ft inside diameter and 13.5 ft outer diameter, each bored in about four months [1]. ProPublica described the Vegas Loop tunnels as 12 feet in diameter in January 2025 [8]. Using the 13.5 ft outer figure, the excavated area is 3.1416 x 6.75 squared, or about 143 square feet.
For comparison, Los Angeles Metro says twin-bore transit tunnels are generally about 20 feet in diameter, and single-bore tunnels carrying both tracks are generally 40 to 50 feet [9]. Metro does not say whether the 20 ft figure is inside or outside diameter, so the area comparison is approximate.
A small bore saves excavation but limits what the tunnel can carry. A 12 ft inside diameter leaves little room beyond one lane of road vehicles, which constrains side walkways, large jet fans, and cross passages. That is why egress spacing and ventilation rules for these tunnels draw so much attention, as covered below.
Prufrock: goals versus what has been demonstrated
As of November 26, 2026, TBC's Prufrock page says the company is targeting 1 mile per week for Prufrock and an all-in cost of less than $5 million per mile for a Loop tunnel [2]. This is a current company target. It differs from the 2021 company estimate of $10 million to $15 million per mile, excluding stations, that the benefits page cites. It describes porpoising, in which the machine arrives on a truck, tilts down, and launches into the ground within 24 hours, which TBC says avoids launch pits and large cranes [2]. In April 2022 TechCrunch reported that Prufrock-2 could mine at 1 mile per week according to TBC, and that Prufrock-3 was designed to tunnel at seven miles per day [10].
Demonstrated results are thinner. On September 6, 2024, TBC posted that Prufrock-3 had completed its first tunnel in Las Vegas, 12 weeks after the Cybertunnel at Giga Texas, with the next launch scheduled for October 30 after upgrades to the Prufrock-4 specification [11]. The post gave no tunnel length or measured digging speed. TBC's Prufrock page currently describes Prufrock-MB1 and MB2 as mining limestone in Nashville for the Music City Loop [2]. No audited or independently measured average advance rate for any Prufrock has been publicly reported, so the mile-per-week and seven-miles-per-day figures are best read as company goals.
A little arithmetic shows what 1 mile per week implies. It is 5,280 ft divided by 7 days, or about 754 ft per day. If one ring were 5 ft long (an assumption for illustration), that is about 150 rings per day, or one ring every 9.5 minutes around the clock. Excavation, segment erection, grouting, and muck removal must all fit inside that cycle. The seven miles per day design figure is 49 times the weekly goal (derived).
Lining segments: rings, gaskets, and tolerances
Bored soft-ground tunnels are usually lined with precast concrete segments assembled into rings inside the shield tail. The FHWA manual describes precast segmental linings used as both initial support and final lining as built to high tolerances, typically heavily reinforced, fitted with gaskets for waterproofing, and bolted so the gaskets compress before the TBM advances [4]. Shield thrust compresses the gaskets in the longitudinal direction, so bolting is often only circumferential [4].
Ring geometry handles alignment. The manual says horizontal and vertical curvature is created with tapered rings, approximating the curve as a series of short chords [4]. Gaskets are the watertight barrier, so the manual cautions that gasketed segments must be installed to high tolerances for the gaskets to perform [4]. It also describes an alternative to the one-pass gasketed lining, an unbolted, ungasketted primary lining with a cast-in-place final lining inside it [4].
Annulus grouting closes the loop. As the ring leaves the tail, contact grouting fills the space the shield occupied, which keeps the ring in continuous contact with the ground and prevents it from dropping into the void [4]. As a hypothetical, a 13.5 ft excavation around a 13.0 ft ring leaves a 3 inch radial gap. Its area is pi/4 x (13.5 squared minus 13.0 squared), or about 10.4 square feet per foot of advance (derived).
Public reporting gives little detail on TBC's lining design. The ENR dimensions imply only that the lining plus any annulus occupies about 0.75 ft (9 inches) of radius, from half the difference between 13.5 ft and 12 ft [1].
Muck handling: volume, bulking, and disposal
Muck is the excavated material. In an EPB machine it leaves the chamber by screw conveyor and then by belt or muck cars [5]. In a slurry machine it is pumped as slurry to a separation plant [7]. Volume follows the bore area. At 143 square feet, each foot of advance excavates 143 cubic feet of in-place ground, so one mile (5,280 ft) is about 755,000 cubic feet, or roughly 28,000 cubic yards (derived).
Excavated ground occupies more volume than it did in place. The ratio is the bulking (swell) factor, and the FHWA manual lists bulking and swell factors among the parameters to be defined in design [4]. With an assumed factor of 1.3 for illustration, that mile becomes about 36,000 cubic yards of loose material to haul, or about 3,600 loads of 10 cubic yards. Conditioning foam and slurry add water and often require drying or treatment before disposal.
TBC says it recycles part of its muck into bricks and pavers, according to the company's statement as quoted by the Las Vegas Advisor in 2022 [12]. That source reported that TBC does not disclose how much soil actually becomes bricks [12].
Disposal has also produced enforcement. In November 2025 Fortune reported that the Clark County Water Reclamation District levied $493,297.08 in fines, including cleanup costs, after TBC crews pumped drilling fluids into capped pipe fittings and manholes [13]. The company accepted responsibility at a September hearing, according to the same report [13]. For engineers, muck and tunnel water are permitted waste streams that belong in the cost and schedule.
Geotechnical risk: the ground decides
Ground conditions dominate tunnel risk. The FHWA manual states that most claims in tunnel construction relate to unforeseen ground conditions, which is why US practice uses Differing Site Condition clauses, Geotechnical Data Reports, and Geotechnical Baseline Reports to allocate that risk [4]. A site investigation program typically combines borings, in situ testing, and laboratory tests. MIT's graduate geotechnical course lists site investigation with emphasis on in situ testing as a core topic [14].
The manual's design checklist asks for bulking and swell factors, and for the rippability of rock, till, caliche, or other hard materials [4]. Caliche is a cemented desert soil, so the item matters in southern Nevada. Its depth and strength vary across the Las Vegas Valley and have to come from site-specific investigation.
Settlement control is the practical test of face control. If face pressure is too low or the annulus is not filled promptly, the ground loses volume and the surface settles. Engineers express this as volume loss, the lost ground volume divided by the excavated volume. For a 143 square foot face, a 1 percent volume loss is 1.4 cubic feet per foot of advance, which spreads upward into a settlement trough (derived). The FHWA manual names maintaining face pressure and immediately grouting the annular void as the first steps in protecting nearby structures [4].
Ventilation, fire life safety, and egress
Two NFPA documents anchor the field. NFPA 502 covers road tunnels, bridges, and other limited access highways, and the FHWA manual says exits into escape routes should be spaced no more than 1,000 feet apart and should comply with the latest NFPA 502 [4]. NFPA 130 covers fixed guideway transit and passenger rail systems. Neither was written for a 12 ft single lane tunnel carrying passenger cars as transit, and Clark County drafted its own chapter for single lane tunnels [3].
The county text would add Chapter 42 to the county fire code, and it requires a fire protection report and an approved means of egress system [3]. Exits directly to grade or open sky default to no more than 1,250 feet apart. The limit rises to 1,800 feet with approved fire department response vehicles, and to 2,500 feet with those vehicles plus cross passages or areas of refuge [3]. A county notice dated March 2026 describes these amendments as proposed, so check the county's current fire code for the adopted version [15].
On ventilation, the text requires an emergency design reviewed by the building official, fire code official, and an independent engineer, with NFPA 130 as a reference. Fans must achieve a critical velocity that prevents backlayering of smoke for a design fire of at least 8 MW. Tenability must be established in the egress zone within 120 seconds of activation and maintained for at least 2 hours [3]. Longitudinal ventilation pushes smoke one way so occupants can escape the other way.
Battery electric vehicles are addressed directly. The text caps vehicle battery energy at 123 kilowatt-hours unless the building and fire officials approve more, and it requires a vehicle evacuation plan on a water flow, fire, or carbon monoxide alarm [3]. The NTSB found that emergency responders face risks from thermal runaway and from battery reignition, and ties them to the stranded energy that remains in a damaged battery [16]. Cooling and long monitoring after a fire are therefore design inputs. No full-scale test of such a fire in a Loop tunnel has been publicly reported.
Public concern predates the ordinance. In October 2020 TechCrunch reported that plans for a long Loop tunnel showed an emergency egress shaft and a small hatch, and that it was unclear whether passengers would climb stairs or a ladder. The article quoted a fire safety expert criticizing ladder-based egress for passengers with limited mobility [17]. In January 2025 ProPublica reported that TBC told the county it would keep submitting fire studies and emergency plans [8].
Study path for students
Tunneling is a small field that rewards early grounding in geotechnical engineering. Here is a practical sequence.
Step 1, courses. Take soil mechanics, rock mechanics, structural analysis, fluid mechanics, and engineering geology. MIT OpenCourseWare publishes free graduate geotechnical material, including course 1.364, which covers site investigation, excavation support, and groundwater control [14]. MIT also publishes 1.361 Advanced Soil Mechanics, and the Geo-Institute of ASCE offers student membership.
Step 2, texts. Read one overview book such as Chapman, Metje and Stark, then the free FHWA road tunnel manual for design practice and contract risk allocation [4]. Maidl et al. goes deep on shield machines. See further reading.
Step 3, standards. Read the scope pages of NFPA 130 and NFPA 502, then compare them with the proposed Clark County single lane tunnel chapter [3].
Step 4, societies and conferences. The Underground Construction Association of SME (UCA) runs the North American Tunneling Conference (NAT), and the Rapid Excavation and Tunneling Conference (RETC) is next scheduled for June 27 to 30, 2027, in New Orleans [20]. UCA offers student chapters and scholarships. For NAT 2026 it invited undergraduate and graduate students to apply for academic and attendance awards [18]. ITA-AITES maintains the About Tunnelling explainer site and working group reports.
Step 5, field time. Look for summer internships with tunnel contractors, owners, design consultants, and TBM makers such as Herrenknecht and Robbins. UCA and RETC networking events are the usual way in. Cost studies like the NYU Transit Costs Project show how procurement and risk, utilities and agency coordination, labor, and design choices drive price [19].
Watch
Picked for this page. The full list is on Videos.
-
So You Want to Build a Tunnel...
Practical Engineering · 2026 · 20:42
Grady Hillhouse of Practical Engineering explores modern tunnel construction methods. A clear general grounding for non-specialists before judging any tunneling claim. Not about TBC.
-
Fire Life Safety Strategies for Tunnels - Nate Lobel (Performance Based Consulting)
SFPE UQ StudentChapter · 2022 · 1:13:46
Fire engineer Nate Lobel gives a student chapter talk on tunnel fire life safety, covering ventilation, fire rating and egress. Long and technical. Useful background for judging small car tunnel safety.
-
EPB Shield | Fast tunnelling technology with a broad application range
Herrenknecht AG · 2025 · 5:59
Herrenknecht explains how its earth pressure balance shield supports the face and removes soil in soft ground. Manufacturer material, so promotional, but a clear account of the machine type.
-
TheRobbinsCo · 2017 · 5:24
Robbins animation of how its main beam hard rock TBMs work. Manufacturer video, good for component basics. Covers a different machine type from the soft ground shields above.
-
Practical Engineering · 2018 · 8:40
Practical Engineering on how rock bolts and simple reinforcement keep rock tunnels from collapsing. Short grounding in ground support. Not about TBC or soft ground.
-
Practical Engineering · 2024 · 20:12
Practical Engineering on the engineering and construction of the Channel Tunnel, including its geology and pressure challenges. A reference case for a large rail tunnel.
-
Imagine - Why cities should know about underground space
ITA AITES · 2013 · 4:37
Short 2013 film from the International Tunnelling Association on why decision makers should consider underground space. Advocacy by a trade body, useful for the planning argument.
Further reading
- Mechanised Shield Tunnelling, 2nd edition, Bernhard Maidl, Martin Herrenknecht, Ulrich Maidl, Gerhard Wehrmeyer (book). Second edition published January 2012. Detailed treatment of EPB, slurry, segment lining, and machine design. The hardcover is out of print, so check libraries or the e-book.
- Introduction to Tunnel Construction, 2nd edition, David Chapman, Nicole Metje, Alfred Stark (book). CRC Press, 2018. Student-level text covering site investigation, TBMs, ground movement, and risk.
- Tunnel Engineering Handbook, 2nd edition, John O. Bickel, Thomas R. Kuesel, Elwyn H. King (eds.) (book). Long-standing US reference on design, construction, and rehabilitation. Springer redirects to its SpringerLink page, which may ask for a login.
- Technical Manual for Design and Construction of Road Tunnels, Civil Elements (FHWA-NHI-10-034), Federal Highway Administration (report). Free December 2009 manual by Parsons Brinckerhoff covering TBM types, segmental linings, geotechnics, and egress. Large PDF.
- About Tunnelling: Mechanized Tunnelling, ITA-AITES (article). Free explainers on EPB, slurry, and hard rock machines.
- Guidelines for the design of segmental tunnel linings (ITA working group publication), ITA-AITES (report). Working group guidance on segmental lining design, from the ITA publications library.
- Transit Costs Project, NYU Marron Institute (article). Database covering 59 countries plus case studies and a final report on why US urban rail costs more.
- Advanced Geotechnical Engineering (1.364), MIT OpenCourseWare (article). Free graduate course materials on site investigation, excavation support, and groundwater control.
- Advanced Soil Mechanics (1.361), MIT OpenCourseWare (article). Free graduate soil mechanics course with lecture notes.
- UCA of SME student resources, Underground Construction Association of SME (article). Student chapters and scholarships for tunneling students. May block automated access.
- RETC, SME (article). Rapid Excavation and Tunneling Conference. The next one is June 27 to 30, 2027, in New Orleans.
- Geo-Institute of ASCE, ASCE (article). Professional society for geotechnical engineers, with student membership.
- NFPA 130 standard development page, NFPA (article). Fixed guideway transit and passenger rail systems standard.
- NFPA 502 standard development page, NFPA (article). Road tunnels, bridges, and other limited access highways standard.
Sources
- ENR, Elon Musk's Boring Co. Completes First Commercial Project (April 16, 2021)
- The Boring Company, Prufrock
- Clark County, proposed ordinance adding 13.04.275 (IFC Chapter 42, Single Lane Tunnels)
- FHWA, Technical Manual for Design and Construction of Road Tunnels, Civil Elements (FHWA-NHI-10-034, Dec 2009)
- Herrenknecht, EPB Shield
- ITA-AITES, EPBS Shield (About Tunnelling)
- ITA-AITES, Slurry Shield (About Tunnelling)
- ProPublica, Boring Company Las Vegas Loop oversight (Jan 8, 2025)
- LA Metro, tunnel boring machine information
- TechCrunch, Boring Company raises $675M (April 20, 2022)
- The Boring Company on X, Prufrock-3 announcement (Sept 6, 2024)
- Las Vegas Advisor, Question of the Day (May 30, 2022)
- Fortune, Boring Company drilling fluid fine (Nov 8, 2025)
- MIT OpenCourseWare, 1.364 Advanced Geotechnical Engineering (Fall 2003)
- Clark County Fire Prevention, public notice on proposed Chapter 42 (March 2026)
- NTSB, Safety Risks to Emergency Responders from Lithium-Ion Battery Fires in Electric Vehicles (SR-20/01, Nov 2020)
- TechCrunch, Las Vegas Loop might only carry a fraction of the passengers it promised (Oct 16, 2020)
- Tunneling Online, UCA Scholarships Now Available for NAT 2026
- NYU Marron Institute, Transit Costs Project final report release (Feb 8, 2023)
- SME, RETC 2027 conference site
Last reviewed November 26, 2026. Spot an error? Use Contact in the header.