Funding and Business Model
The Boring Company is privately held, so its finances are mostly opaque. Reported funding rounds and contracts show how it raises money and earns revenue, how that differs from conventional transit finance, and what remains undisclosed.
- $3 billionSeries D reported September 2026, led by the United Arab EmiratesSource [1]
- $23 billionValuation reported for the Series DSource [1]
- $675 millionSeries C raised in April 2022 at a $5.7 billion valuationSource [2]
- $48.6 millionValue of the 2019 LVCVA contract for the Convention Center LoopSource [3]
- 60%Statutory cap on the federal share of a New Starts transit projectSource [4]
TBC's funding history
The Boring Company began as a Musk side project. In July 2019 TechCrunch reported that it had sold $120 million in stock in what it called its first outside investment, and that TBC had previously raised nearly $113 million [5]. GeekWire reported that Musk put in more than 90 percent of the money in that 2018 round and that the company said the rest came from early employees, with no venture capitalists or outside investors [14]. CNBC, citing Bloomberg and a securities filing, also described the $120 million as the first outside investment [6]. Neither report stated a valuation for that round.
TechCrunch named the main 2019 investors as 8VC, Vy Capital, Craft Ventures, Valor Capital and DFJ, and said Steve Jurvetson invested through his new fund [5].
In April 2022 TBC raised a $675 million Series C led by Vy Capital and Sequoia Capital, with participation from Valor Equity Partners, Founders Fund, 8VC, Craft Ventures and DFJ Growth. TechCrunch reported that it set the valuation at $5.7 billion [2].
In July 2026 the Wall Street Journal reported exclusively that TBC was in talks to raise about $4 billion at a valuation of roughly $20 billion. The report, as relayed by Investing.com, cautioned that the financing had not closed and that its size and valuation could change [7]. In September 2026 TechCrunch reported a $3 billion Series D led by the United Arab Emirates that pushes the valuation to $23 billion [1]. The Next Web gives the same lead investor and valuation [8]. Neither names a specific fund or state entity, so "the United Arab Emirates" is the reporting's own wording and rests on these two reports. The final round was therefore smaller than the figure first reported, and at a higher valuation.
TechCrunch listed Andreessen Horowitz, Sequoia Capital, Human Capital, Vy Capital and Valor Equity Partners as other participants. It said the company plans to dig more than 150 kilometers of tunnels in the UAE [1].
Commentary on the Series D flagged how little is disclosed. The Next Web noted that no revenue, cost per kilometer, or fare and contract economics appeared in the announcement or the reporting, and that the operating figures TBC cited are unaudited [8]. The same article, citing the Wall Street Journal, said investors were expected to help recruit workers or make introductions to city officials, and that Musk confirmed the report on X [8]. As of November 26, 2026, TBC had not disclosed a cumulative total raised.
How TBC earns revenue
TBC has used two quite different arrangements in Las Vegas. In the first, a public agency pays for a system. The Las Vegas Convention and Visitors Authority (LVCVA) voted in 2019 to approve a $48.6 million contract with TBC for the Convention Center Loop [3].
ProPublica gives a second figure for the same project. It reported that the authority committed $52.5 million in bonds to fund the loop, to be repaid by the agency, and that it has paid TBC about $4.5 million a year to operate it [9]. The two numbers describe different things. The $48.6 million is the contract value reported when it was approved, while the $52.5 million is the bond financing the authority took on. Public reporting does not itemize the roughly $3.9 million gap, and the reporting reviewed gives no final contract value after the 2019 approval.
In the second arrangement, the Vegas Loop is privately built under a Clark County franchise. The LVCVA described the model this way: TBC pays for development, property owners pay for stations, and passengers pay fares [10]. ProPublica reported that the county commission approved a 50-year agreement giving TBC the right to operate on county property [9]. Because the system receives no federal funding, ProPublica said it is exempt from the kinds of exhaustive governmental vetting that federally funded projects face [9].
Fares are the direct revenue source for the Vegas Loop. Travel within the Convention Center campus is free of charge, while travel to destinations outside the campus requires a ticket [11]. Prices vary by route, so readers should check the operator for current fares. What individual properties pay for stations has not been publicly reported.
How conventional transit is financed
In the United States, major fixed-guideway transit is often co-funded through the FTA Capital Investment Grants program. Federal law limits the CIG share to 60% for New Starts projects and 80% for Small Starts and Core Capacity projects [4]. In practice the share is usually lower. A 2016 Congressional Research Service report, drawing on GAO figures, said the federal government paid 45% of the cost of New Starts projects on average, with local sources covering 48% and states about 7% [12].
That money comes with process. The same report describes three major phases for New Starts projects, which are project development, engineering and construction, with federal funding usually committed through a Full Funding Grant Agreement [12]. The effect is more public scrutiny and, usually, a longer timeline than a privately funded build.
Other tools exist alongside grants. In an availability payment public-private partnership, the public sponsor compensates a private concessionaire based on performance. FHWA says the private sector takes on most of the risks of design, construction, financing, operation and maintenance [13]. Local taxes and bonds supply most of the non-federal share of grant-funded projects [12].
The Vegas Loop differs from this pattern. Supporters point to speed and the lack of federal cost. Critics point to the reduced oversight that comes with skipping federal review, which ProPublica documented [9]. Both observations can hold at once.
Unit economics: what is known and unknown
Because TBC is private, there is no public income statement, per-rider cost, or audited ridership. ProPublica reported that TBC says its system will be able to move 90,000 passengers an hour [9].
Reported usage figures are company statements. The Next Web relayed TBC's claim of more than four million Vegas Loop passengers and described the company's figures as unaudited [8]. A cumulative total does not by itself show daily utilization, fare yield or whether operations cover costs.
Network scale matters to the economics. ProPublica reported that TBC had completed more than 5 miles of the 68-mile system it has planned [9]. A network that small mostly serves the convention center and nearby resorts, so utilization tracks event-driven demand and depends on whether the station network grows.
Readers who want to judge the model should watch for audited statements, county franchise reports and independent ridership counts.
Watch
Picked for this page. The full list is on Videos.
-
Why Boring Company Tunnels Cost Millions, Not Billions | Steve Davis | TomorrowX Summit
iConnections · 2026 · 16:37
Steve Davis, interviewed by investor Antonio Gracias at the TomorrowX Summit in 2026, on TBC's origins, machine automation and its cost claims. Company figures in a friendly setting, not independently audited.
-
Why Elon Musk’s Boring Company Isn’t Fixing Traffic Anytime Soon
CNBC · 2021 · 13:05
CNBC's 2021 look at TBC's first public loop in Las Vegas and its stalled projects elsewhere. A fair outside summary of the early record. Later developments are not covered.
-
Part 4 FULL Interview with STEVE Davis of the BORING Company
Tesla Owners Silicon Valley · 2026 · 44:56
Fourth part of a filmed 2026 visit with Steve Davis, a long conversation on tunnels, Prufrock and future plans. Detailed and in his own words. The host is a Tesla enthusiast group.
-
Musk’s Boring Company Wanted to Dig Cities Out of Traffic: What Happened?
The Wall Street Journal · 2022 · 5:18
Wall Street Journal video from 2022 comparing TBC's early vision of traffic-busting tunnels with what it had built five years on. A concise business retrospective.
-
Musk’s Boring Co. Gets $23 Billion Valuation
Bloomberg Tech · 2026 · 2:00
Bloomberg Tech segment from September 2026 on a reported $23 billion valuation for The Boring Company. Useful for investor appetite. A valuation is not evidence of operating performance.
-
Why is Musk's Boring Company buying real estate along the Las Vegas Loop?
The Nevada Independent · 2025 · 1:02
Brief Nevada Independent explainer from 2025 on TBC buying properties near planned Vegas Loop routes. Raises the real estate side of the business. Short.
Further reading
- Public Transportation Capital Investment Grant (New Starts) Program: Background and Issues for Congress, Congressional Research Service (report). Plain account of how New Starts funding and approval work.
- Availability payments, FHWA (article). Short explainer of a common P3 payment structure.
Sources
- TechCrunch, The Boring Company raises $3B in round led by UAE (2026-09-10)
- TechCrunch, Elon Musk's Boring Company raises $675M to scale Loop projects (2022-04-20)
- CNBC, Boring Co. lands first paying customer, a $48.6 million contract in Las Vegas (2019-05-23)
- Congressional Research Service, IN12748, DOT Family Friendly Policy and Public Transit Project Funding (2026-10-15)
- TechCrunch, Elon Musk's Boring Company snags $120 million in new funding (2019-07-25)
- CNBC, Elon Musk's Boring Co. raises $120 million to build more tunnels (2019-07-25)
- Investing.com, Elon Musk's Boring Company seeks $20 billion valuation in funding talks (2026-07-24), reporting the Wall Street Journal
- The Next Web, The Boring Company raises $3bn at a $23bn valuation, led by the UAE
- ProPublica, Elon Musk's Boring Company Las Vegas Loop oversight investigation
- LVCVA, Las Vegas destination one step closer to reducing traffic congestion
- Visit Las Vegas, Transportation
- Congressional Research Service, R44534, Public Transportation Capital Investment Grant (New Starts) Program (2016)
- FHWA, Availability Payments
- GeekWire, Not boring: Elon Musk's Boring Company raises $113M for transit tunnels (April 2018)
Last reviewed November 26, 2026. Spot an error? Use Contact in the header.